Maintenance Responsibilities for Cornell's Pesticide Storage Facilities

Each facility has a maintenance manual and a 1-2 page "Maintenance and Winterizing" document summarizing critical issues in these areas. Pesticide storage facility managers should be familiar with these documents.

In general, facility managers are responsible for:
In general, Bob Traphagen and Contract Colleges Facilities (CCF) will be responsible for:

Although proper maintenance and regular walk-through inspections of the buildings should eliminate most facility emergencies, some emergencies are bound to occur. The managers must use their best judgment as to how to proceed in dealing with an emergency. Should the manager need to work with a local contractor, under an existing pre-approved blanket (for off-campus facilities) or through the PDC shops, through customer service (for Ithaca facilities), Bob Traphagen should be notified as soon as possible as to the condition of the building and the steps taken to repair it. Only the minimum work necessary to deal with the emergency condition should be undertaken without Bob or CCF's permission.

Contact information:
Robert Traphagen Customer Service
255-1584
or contact
255-5322
cell 279-1820